Independent reviews, investigations and second opinions that help you decide what to do — and explain why. Calculations, settings, logic and documentation developed to an agreed scope, ready for your team's review and implementation.

01 · Calculation

Protection Studies & Settings Calculation

Short-circuit, coordination and relay settings calculations with a documented basis your engineers can review.

Scope, inputs and boundaries

Relevant when

  • The network has changed since settings were last calculated.
  • Trips have been non-selective or difficult to explain.
  • New equipment or a new installation needs settings.
  • Existing settings have no documented basis.

Advice & review outputsEngineering deliverables

  • Settings criteria and protection philosophy review
  • Independent review of existing settings
  • Review of disturbance and event records you provide
  • Review of third-party study reports
  • Short-circuit and coordination study report
  • Relay settings schedule with calculation references
  • Time–current coordination plots
  • Manufacturer-native settings files, where the platform, tools and scope allow
02 · Logic

Protection Logic & Scheme Design

Protection philosophy, programmable relay logic, I/O definitions and communications schemes that can be reviewed before they are configured.

Scope, inputs and boundaries

Relevant when

  • A new scheme needs its tripping, interlocking and breaker-failure logic defined.
  • An operation has raised questions about existing logic.
  • A panel builder or integrator needs I/O and signal definitions.
  • Hardwired signals are being considered for replacement by communications.

Advice & review outputsEngineering deliverables

  • Philosophy and scheme review
  • Review of logic after an unexpected operation
  • Hardwired versus communications-based signalling options
  • Interlocking and operating philosophy workshops
  • Protection logic diagrams
  • I/O and signal matrices
  • Logic test specifications
  • Relay logic configuration, where the platform, tools and scope allow
03 · Modernization

Protection System Modernization

Assessment and engineering support for replacing legacy protection, with interfaces, settings and phasing considered from the start.

Scope, inputs and boundaries

Relevant when

  • Relays are obsolete or spare parts are hard to obtain.
  • Documentation does not match the installation.
  • A wider upgrade or digitalization programme needs a protection plan.
  • Maintenance findings show unreliable or drifting relays.

Advice & review outputsEngineering deliverables

  • Fleet condition and obsolescence review
  • Retrofit versus replacement options
  • Phasing strategy
  • Owner's technical review of contractor designs
  • Modernization assessment report
  • Replacement settings, logic and I/O definitions
  • Test specifications
  • Input to cutover sequences and as-built documentation